Dongguan Fang Rong Precision Machine Industrial Factory
Products
Contact Us
  • Contact Person : Ms. Chou Shelly
  • Company Name : Dongguan Fang Rong Precision Machine Industrial Factory
  • Tel : 86-769-83202641
  • Fax : 86-769-83126559
  • Address : Guangdong,Dong Guan City,No.238, XianJiang Road,Xia Cun, Shi Xia, Da Lang Town, Dong Guan City.
  • Country/Region : China

FR25 type shrink pipe machine, metal tube pipe processing machine

FR25 type shrink pipe machine, metal tube pipe processing machine
Product Detailed
Related Categories:Pipe Making Machinery
passed the ISO9000:2001 quality system certification, received a number of patents,create professional and classic equipments

FR25 type shrink pipe machine,metal tube pipe processing machine

Max shrinking pipe diameter:25*T2.0mm

Min shrinking pipe diameter : 6mm change base mold 3mm

Mould numbers: 4 mold

Mould length:60mm

Main axis motor:4KW-4N

Main axis turns numbers: 238turns/min

Weight:1200KG                        

Dimension (L*W*H):900*1000*1300(mm)

Quality guarantee:

 (1) Factory guarantees machinery well packed and testing qualified before shipment. 

 (2) Factory guarantees all the goods are brand-new; no defects for the specifications or materials used. Twelve months quality warranty after Customer accepts the inspection for machinery’s trial operation.

Claims

Customer has rights to claims if there is quality problem caused by deficient manufacturing procedure, material or technical parameter, which doesn’t match the contract specified, factory will take responsibility for all related expenses caused.

Penalty

1, if contractual delivery day postponed due to factory’s reason except force-majeure, Customer has rights to get the compensation by portion from factory based on the followings:

(1)   factory has ten days grace period

(2)   Starting from the eleven days after delivery day postponed, every day’s penalty for factory is the whole contract amount’s 0.1%.

2, if contractual payment day postponed due to Part A’s reason except force-majeure, factory has rights to get the compensation by portion from Customer based on the followings:

(1)    Customer has ten days grace period

(2)   Starting from the eleven days after payment day postponed, every day’s penalty for Customer is the whole contract amount’s 0.1%.

3, the above mentioned penalty total amount can not be exceeding the whole contract amount’s 5%.

Force Majeure:

We factory shall not be held responsible for late delivery of the goods owing to generally recognized Force Majerue. Factory should notice Customer by oral immediately. 15 days later after force Majerue happens, and post customer the written proof documents from the related departments. If force manjerue keeps more than 60 days, Customer can cancel the contract. Factory should return the payment.

Technical materials provide:

Factory should provide the following data

Each of Chinese / English version manual and matching tools enclosed for one machine.

Contract amendment

Any changes for the contract clauses, a written contract amendment must be signed by both parties.

Arbitration

If there is dispute during contract implementation, we should settle through  negotiation made in the principle of fair cooperation. If not, the case under dispute shall be submitted for arbitration. Which has the same equally binding to both Parties, The cost of arbitration shall be borne by the losing party. During the arbitration, the non-dispute portion of the contract continues to implement except the arbitration part.

FR25 type shrink pipe machine, metal tube pipe processing machine



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.