Dongguan Fang Rong Precision Machine Industrial Factory
Products
Contact Us
  • Contact Person : Ms. Chou Shelly
  • Company Name : Dongguan Fang Rong Precision Machine Industrial Factory
  • Tel : 86-769-83202641
  • Fax : 86-769-83126559
  • Address : Guangdong,Dong Guan City,No.238, XianJiang Road,Xia Cun, Shi Xia, Da Lang Town, Dong Guan City.
  • Country/Region : China

FR-10x30 3T CAM full tooth machine,steel bar thread rolling machine

FR-10x30 3T CAM full tooth machine,steel bar thread rolling machine
Product Detailed
Related Categories:Pipe Making Machinery
Lower noise and durable. automatic feeding device is optional. rolling shape: rolling thread, textured, ruled, roll bars etc

FR-10x30 3T CAM  full tooth machine,steel bar thread rolling machine,steel pipe making machine

Model:   FR-10*30 3T CAM full tooth machine

Screw diameter rolled:   2-6MM

Pitch range :      0.4-1P

The maximum length of rolled screws:    unlimited

Wheel speed  :                40rpm

Wheel diameter  :          100mm

Roller inner diameter :    50.5mm

Wheel Thickness     :     30mm 8*4

The distance between wheel axle     :      130mm

Wheel volume  : 90mm

Wheel shaft angle      :    20-40roll/minute

Main Motor    :  1HP

Hydraulic motor       :     85mm

dimension   :   650*850*750

Machine size   :  280kg 

Following are features of Threaded Rolling Machines:

1, Specialized for metal tubes designing, use triangle support, it can guarantee the work pieces real roundness when by rolling.

2, Fixed Roll/ Pass: two applied.

3, Adopt Taiwanese column injection pump and Hydraulic system accessories, electrical. Asphalt can be used long and no heating without cooling system.

4, Use the imported Gimbal, lubrication system used the electric pump, change manual lubricating pump, use the Japanese bearing.

5, Lower noise and durable.

6, Automatic feeding device is optional.

7, rolling shape: rolling thread, textured, ruled, rolling light, cross knurling, roll bars, rolling groove, and roll-off

Quality Process Certifications: ISO 9000-2001 

Quality guarantee:

 (1) Factory guarantees machinery well packed and testing qualified before shipment. 

 (2) Factory guarantees all the goods are brand-new; no defects for the specifications or materials used. Twelve months quality warranty after Customer accepts the inspection for machinery’s trial operation.

Claims

Customer has rights to claims if there is quality problem caused by deficient manufacturing procedure, material or technical parameter, which doesn’t match the contract specified, factory will take responsibility for all related expenses caused.

Penalty

1, if contractual delivery day postponed due to factory’s reason except force-majeure, Customer has rights to get the compensation by portion from factory based on the followings:

(1)   factory has ten days grace period

(2)   Starting from the eleven days after delivery day postponed, every day’s penalty for factory is the whole contract amount’s 0.1%.

2, if contractual payment day postponed due to Part A’s reason except force-majeure, factory has rights to get the compensation by portion from Customer based on the followings:

(1)    Customer has ten days grace period

(2)   Starting from the eleven days after payment day postponed, every day’s penalty for Customer is the whole contract amount’s 0.1%.

3, the above mentioned penalty total amount can not be exceeding the whole contract amount’s 5%.

Force Majeure:

We factory shall not be held responsible for late delivery of the goods owing to generally recognized Force Majerue. Factory should notice Customer by oral immediately. 15 days later after force Majerue happens, and post customer the written proof documents from the related departments. If force manjerue keeps more than 60 days, Customer can cancel the contract. Factory should return the payment.

Technical materials provide:

Factory should provide the following data

Each of Chinese / English version manual and matching tools enclosed for one machine.

Contract amendment

Any changes for the contract clauses, a written contract amendment must be signed by both parties.

Arbitration

If there is dispute during contract implementation, we should settle through  negotiation made in the principle of fair cooperation. If not, the case under dispute shall be submitted for arbitration. Which has the same equally binding to both Parties, The cost of arbitration shall be borne by the losing party. During the arbitration, the non-dispute portion of the contract continues to implement except the arbitration part.

FR-10x30 3T CAM full tooth machine,steel bar thread rolling machine



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.