Dongguan Fang Rong Precision Machine Industrial Factory
Products
Contact Us
  • Contact Person : Ms. Chou Shelly
  • Company Name : Dongguan Fang Rong Precision Machine Industrial Factory
  • Tel : 86-769-83202641
  • Fax : 86-769-83126559
  • Address : Guangdong,Dong Guan City,No.238, XianJiang Road,Xia Cun, Shi Xia, Da Lang Town, Dong Guan City.
  • Country/Region : China

FR-100*100-10 Hydraulic Automatic Rebar thread rolling machine

FR-100*100-10 Hydraulic Automatic Rebar thread rolling machine
Product Detailed
Rebar thread rolling machine Rolling diameter: 10-100mm Pitch: 0.5-6MM Length(in-feed) : 50-120mm

FR-100*100-10 Hydraulic Automatic Rebar thread rolling machine

Hydraulic rolling machine Use for metal pipe thread rolling dual-use for rolling through and fixed Skate with hydraulic feed drive, accurate positioning; Suitable for processing small pitch and long large parts; With square guiding line design, guiding line grinding after heat treatment, to strengthen the machinery moving smoothly.

Rolling the largest diameter100MM
Rolling minimum diameter10MM
Rolling pitch range0.5-6MM
Rolling  of length(in-feed)50-120MM
Rolling of length(thru-feed):unlimited, 10-50
Max. diameter 75MM 
Width range50-120MM
Roller chain slot12 * 6MM
Maximum distance250MM
Minimum distance145MM
Maximum rolling pressure300kn
motor power15HP
hydraulic power7.5HP hydraulic system
Cooling Motor1/4HP (0.18KW)
Roller obliquityplus or minus 4 degrees
Machine size1950 * 1800 * 1600
Machine weight3200 KG

 Following are features of Threaded Rolling Machines:

1, Specialized for metal tubes designing, use triangle support, it can guarantee the work pieces real roundness when by rolling.

2, Fixed Roll/ Pass two applied.

3, Adopt Taiwanese column injection pump and Hydraulic system accessories, electrical. Asphalt can be used long and no heating without cooling system.

4, Use the imported Gimbal, lubrication system used the electric pump, change manual lubricating pump, use the Japanese bearing.

5, Lower noise and durable.

6, Automatic feeding device is optional.

7, rolling shape: rolling thread, textured, ruled, rolling light, cross knurling, roll bars, rolling groove, and roll-off

Quality Process Certifications: ISO 9000-2001 

Quality guarantee:

 (1) Factory guarantees machinery well packed and testing qualified before shipment. 

 (2) Factory guarantees all the goods are brand-new; no defects for the specifications or materials used. Twelve months quality warranty after Customer accepts the inspection for machinery’s trial operation.

Claims

Customer has rights to claims if there is quality problem caused by deficient manufacturing procedure, material or technical parameter, which doesn’t match the contract specified, factory will take responsibility for all related expenses caused.

Penalty

1, if contractual delivery day postponed due to factory’s reason except force-majeure, Customer has rights to get the compensation by portion from factory based on the followings:

(1)   factory has ten days grace period

(2)   Starting from the eleven days after delivery day postponed, every day’s penalty for factory is the whole contract amount’s 0.1%.

2, if contractual payment day postponed due to Part A’s reason except force-majeure, factory has rights to get the compensation by portion from Customer based on the followings:

(1)    Customer has ten days grace period

(2)   Starting from the eleven days after payment day postponed, every day’s penalty for Customer is the whole contract amount’s 0.1%.

3, the above mentioned penalty total amount can not be exceeding the whole contract amount’s 5%.

Force Majeure:

We factory shall not be held responsible for late delivery of the goods owing to generally recognized Force Majerue. Factory should notice Customer by oral immediately. 15 days later after force Majerue happens, and post customer the written proof documents from the related departments. If force manjerue keeps more than 60 days, Customer can cancel the contract. Factory should return the payment.

Technical materials provide:

Factory should provide the following data

Each of Chinese / English version manual and matching tools enclosed for one machine.

Contract amendment

Any changes for the contract clauses, a written contract amendment must be signed by both parties.

Arbitration

If there is dispute during contract implementation, we should settle through  negotiation made in the principle of fair cooperation. If not, the case under dispute shall be submitted for arbitration. Which has the same equally binding to both Parties, The cost of arbitration shall be borne by the losing party. During the arbitration, the non-dispute portion of the contract continues to implement except the arbitration part.

FR-100*100-10 Hydraulic Automatic Rebar thread rolling machine



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.