Dongguan Fang Rong Precision Machine Industrial Factory
Products
Contact Us
  • Contact Person : Ms. Chou Shelly
  • Company Name : Dongguan Fang Rong Precision Machine Industrial Factory
  • Tel : 86-769-83202641
  • Fax : 86-769-83126559
  • Address : Guangdong,Dong Guan City,No.238, XianJiang Road,Xia Cun, Shi Xia, Da Lang Town, Dong Guan City.
  • Country/Region : China

FR-20-04 bar straightening machine,roll forming machine

FR-20-04 bar straightening machine,roll forming machine
Product Detailed
bar straightening machine Lower noise and durable. ultra-precision Maximum diameter: 20mm minimum diameter: 4mm

FR-20-04 bar straightening machine,roll forming machine

 Straightening Maximum diameter 20mm
 Straightening the minimum diameter 4mm
 Roller group number 15
 Total power 3KW 
 Weight 700KG
 Size 1100 * 1050 * 950mm

Straightening machine is straightening for metal bar, pipe, wire and other equipment. Straightening machine changes straightness by the straightening roller squeezing on the bar, etc, generally, there are two rows of straightening rollers and numbers different.  There are also two roller straightening machines to straighten the material of different diameters, which rely on two roller (middle concave, hyperbolic roll) of.

The main types has:  pressure straightening machine, balance roller straightening machine, shoes roller straightening machine, rotating anti-straightening machine and so on

Straightening machine and process equipment from Da Lang Fang Rong Machinery Factory, established in 2000, is a professional design, manufacturing, non-ferrous metals and ferrous metal tube, rod, row, and wire production line equipment manufacturers, the main products are straightening machine, drawing machine, chickened machines , rolling machine. Established the whole series lines equipment from drawing, straightening, polishing, until to the finished production according to customer requirements, the design concepts is to design, manufacturing equipment based on customer demand

Quality Process Certifications: ISO 9000-2001 

Quality guarantee:

 (1) Factory guarantees machinery well packed and testing qualified before shipment. 

 (2) Factory guarantees all the goods are brand-new; no defects for the specifications or materials used. Twelve months quality warranty after Customer accepts the inspection for machinery’s trial operation.

Claims

Customer has rights to claims if there is quality problem caused by deficient manufacturing procedure, material or technical parameter, which doesn’t match the contract specified, factory will take responsibility for all related expenses caused.

Penalty

1, if contractual delivery day postponed due to factory’s reason except force-majeure, Customer has rights to get the compensation by portion from factory based on the followings:

(1)   factory has ten days grace period

(2)   Starting from the eleven days after delivery day postponed, every day’s penalty for factory is the whole contract amount’s 0.1%.

2, if contractual payment day postponed due to Part A’s reason except force-majeure, factory has rights to get the compensation by portion from Customer based on the followings:

(1)    Customer has ten days grace period

(2)   Starting from the eleven days after payment day postponed, every day’s penalty for Customer is the whole contract amount’s 0.1%.

3, the above mentioned penalty total amount can not be exceeding the whole contract amount’s 5%.

Force Majeure:

We factory shall not be held responsible for late delivery of the goods owing to generally recognized Force Majerue. Factory should notice Customer by oral immediately. 15 days later after force Majerue happens, and post customer the written proof documents from the related departments. If force manjerue keeps more than 60 days, Customer can cancel the contract. Factory should return the payment.

Technical materials provide:

Factory should provide the following data

Each of Chinese / English version manual and matching tools enclosed for one machine.

Contract amendment

Any changes for the contract clauses, a written contract amendment must be signed by both parties.

Arbitration

If there is dispute during contract implementation, we should settle through  negotiation made in the principle of fair cooperation. If not, the case under dispute shall be submitted for arbitration. Which has the same equally binding to both Parties, The cost of arbitration shall be borne by the losing party. During the arbitration, the non-dispute portion of the contract continues to implement except the arbitration part.

FR-20-04 bar straightening machine,roll forming machine



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.